Who is this for in the Grand Valley?
More shops than people expect. Federal job data for 2025 counts 195 manufacturing businesses in Mesa County, with 2,899 people working in them. Fabricated metal alone is 28 shops and 464 jobs.
Whatever the size, the question on the floor is the same one big plants solve with expensive software: where is every job right now, and which one is going to be late?
What should the board actually show?
Columns are stations, in the order work flows through your shop. For a small fab shop that might be: Waiting on material, Cut, Machine, Weld, Finish, QC, Ready to ship. Use your own words, not a software vendor's.
Each job is one card, and the card shows five things:
- Job number (the one already on your paperwork)
- Customer
- Quantity
- Due date, with the card turning a warning color three days out and red when it's late
- Status: running, waiting, or on hold, plus a short reason when it's not running ("waiting on powder coat")
That's it. Drawings, routing notes and pricing stay where they live now. The board answers one question at a glance: what's where, and what's in trouble.
Why do shop boards get abandoned?
Usually for one of three reasons.
It's double entry. If someone has to update the ERP, the paper traveler and the board, the board loses. It has to be the easiest of the three, or fed from one of the others.
The wrong person updates it. If the office updates the board from memory at 4 PM, it's wrong by 9 AM. The person standing at the station when the job moves is the only one who knows, so updating it has to take them one tap, with gloves on if possible.
It shows too much. A card with 15 fields gets ignored. Five fields get read from across the floor.
Whiteboard, spreadsheet or a screen?
Be honest about what you need.
A whiteboard and magnets works fine for a shop with a handful of jobs moving at once and everyone in one room. It's cheap, it's visible, and nobody needs a login.
A shared spreadsheet adds history and lets the office see it, but nobody on the floor updates a spreadsheet from a welding booth.
A screen on the wall with a tablet or phone at each station makes sense when you have more jobs than fit on a whiteboard, more than one building or shift, or customers calling to ask where their order is. That's the version this post is about.
What would we build for a shop like this?
We build dashboards and simple custom tools, and this is how we'd approach a schedule board, though we haven't built one for a manufacturer yet:
- A TV on the floor showing the board, big enough to read from 20 feet, refreshing on its own.
- A tablet or phone at each station with one screen: the jobs at that station, and a big button to start, pause with a reason, or send it to the next station.
- The office view on any computer, with the ability to drag a card to reorder priority.
- Customer status, if you want it: a simple link a customer can check instead of calling, showing only their job and its stage.
- It works alongside what you have. If you run an ERP or keep jobs in a spreadsheet, the board reads job numbers from it or from a daily export, so nobody types jobs in twice. And you can export everything back out.
We'd start by standing on your floor for an hour and watching a job move. The columns come from that, not from a template.
How would I know if it's working?
Three checks after the first month:
- Is the board right when you walk up to it without warning? Spot check five cards.
- Did anyone get surprised by a late job that the board already showed as red? If yes, people aren't looking at it. If no, it's doing its job.
- Are customers calling less to ask where their order is? Count the calls for a week before and a week after.
If the first check fails, the fix is almost always making the station update easier, not adding more features.